|
NOTES:
1.
Development length based on ACI 318-95 with:
fy = 60000 psi,
f'c = 4000 psi
2.
Minimum ld required to prevent rebar pullout
*ld
for clear spacing of 2db and clear cover not less than db
**lhd
includes 0.7 factor for 2.5 in cover on sides and 2 in cover on end of
hook |