Highland Avenue Grade Separation Project:
A 20 foot high tieback wall was constructed in front of an existing cold
storage building for the Highland Avenue Grade Separation Project. This
wall was constructed in four lifts using tiebacks anchored against a shotcrete
facing. An architectural facing was added to the outside of the wall to
match the adjacent cantilevered concrete retaining walls. The wall was
designed by DMJM+HARRIS for the City of
Fullerton, California.
|